The Sunflower North and Sunflower South Buildings are connected together along with the Meadowlark Building to create the Sunflower Complex. The Sunflower North Building was completed in 2001, and the Sunflower South Building was completed in 2002. These buildings offers ADA accessible restrooms, a concession in each building, concrete floors, office space and a modern look outside. The Sunflower South has a charming outdoor courtyard where guests can enjoy a cool beverage during the summer months. Vehicle parking is plentiful and is located east and north of this facility. Both buildings offer flexibility with overhead doors creating easy access.